Monday, July 4, 2011

Fisher Roc 809 OR Fisher Roc 107 | Roclink

Oil and Gas Wells!


Fisher Roc 809 and Fisher Roc 107


You will need Roclink installed.


Production Manager User Program is designed to manage production operations at an oil or gas site. These operations include well production control and deliquification methods. The program presents the user with choices for configuring production wells, and many different event-driven data points so the user can  make configuration decisions that affect production.

The program currently allows you to have six production wells/meters. If using the gas lift method, it can handle six injection meters and six production meters. The program provides three multi-tabbed configuration templates, one for general configuration, a second for utilities and basic logic and a third for operations and data.

These templates are found by navigating the tree view in Roclink800 to the "User Program" element and expanding it to show the "Production_Mngr" user program. The three templates as shown above are titled "Prod Mgr Configuration" (display #17), "Prod Mgr Utilities" (display #18) and "Prod Mgr Operate" (display #19). Each has a capacity of six wells.

DOWNLOADING AND STARTING THE USER PROGRAM

After you have installed the ROCLink software and connected to the device, you may download the user programs. Follow the instructions below to download the Production Manager program:


1. Open the device window and make sure you are on-line. You will see the directory for the ROC device. Click the plus sign next to User Program to see the programs installed. Click Administrator to download and install the Production Manager program:





2. At the User Program Administrator window, click the first
No Program slot, highlight it:





 

3. In the Browse window, navigate to the Program Files subfolder in the 107 ProductionMgr v2.0 MAT#92184 folder on your Vinson software CD. Choose the PM_Prog1_v204.tar file and click Open:


4. The program name will appear in the Download User Program File field. Click Download & Start:



 
5. You will see a prompt. Click Yes to download the Production Manager program:


 

6. You will see the progress of the download on the status bar:


7. You will see a message when the download is complete. Click OK.





8. Repeat the above steps for programs 2, 3, and 4.


9. When all four programs are downloaded and started, click Close:
TROUBLESHOOTING
GETTING HELP
For help with issues such as conflicting point types or display numbers, or for further assistance, contact your Emerson Local Business Partner.
CONFLICTS WITH OTHER USER PROGRAMS
If the user program fails to install (“Download FAILED”), it is possible that this program’s data point types (25, 26, 27, 28, 29, 30, 35, and 36) or display numbers (17, 18 and 19) are being used by another user program.
If no license is found, the program will display “NO LICENSE” in the Program Status Message field and will not execute any logic.
If you experience either of the above difficulties, please contact your Emerson Local Business Partner

No comments:

Post a Comment